Lay down and installation

Providing the most sufficient and economical efficient vessel regarding the technical and environmental requirement

A) Lay down vessel

Providing the most sufficient and economical efficient vessel regarding the technical and environmental requirement:

  • DP Vessel
  • Installation barge

 

B) Vessel Mobilization regarding the installation disciplines :

  • Mobilization for Pipe/Cable reel installation
  • Carousel type mobilization

 

C) Installation equipment

  • Remote operation vehicle (ROV)
  • Tensioner
  • Rear Chute
  • Saturation Diving facilities
  • Pedestals and V-brackets
  • Winches and wheels
  • Floating bags
  • Electrical connectors and insulators (cables/umbilicals)

 

D) Pre-installation and arrangement

  • Platform preparation
  • Seabed preparation/trenching
  • Clamps and ancillaries installation
  • Anode installation

 

E) Installation

  • Pipe/Cable lay down
  • Anode and ancillary installation
  • Pipe Connections (Grayloc/Flange type)
  • Cable/Umbilical connections and termination
  • Bend Stiffeners and restrictors

 

F) Post-installation and arrangement

  • Mattress and ballast module installation
  • Protectors

Links

About | Blue Behbood

BlueBehbood Co. as a subsidiary of BehBood Farayand Control (BFC) group is dedicated to provide A-Z solutions in maritime and offshore disciplines by the mean of EPCI+F contractor and supplier.

Blue Behbood welcomes your feedback through the Web site.

Address: Unit 5, No. 48, Negar St, Northern Valiasr Ave., Vanak Sq., Tehran, Iran

Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

Tel: +98 21 88874209
Fax: +98 21 88779525